AIS Pre-Flight Preparations

Airmanship Safety Site Assessment & Pre-Flight Briefing — SACAA Part 101 RPAS — Revision 3

SACAA Part 101
Mission Information
Pre-Site Assessment
Airspace in fly-away zone
Airspace / UnitFrequencyTel no. if applicable
Check Lists

Tick each item to confirm it is in order before commencement of flight operations

Pre-Flight Authorisation
On-Site Documentation
Weather — METAR & TAF
NOTAMs
Solar Flare Forecast — KP Level

KP 1–4: Continue operations  |  KP 5–6: Monitor — switch to ATTI mode if necessary  |  KP 7–9: No flying

Radio Procedure — Aerodrome / ATC Communication

Fill in the station details. The take-off and landing scripts will auto-generate below.

Radio call — Take-off

Format: Station — Who you are — Where — Altitude — How long — Who you are

Fill in the fields above to generate the script.
Radio call — Landing / Detail complete

Format: Station — Who you are — Detail complete — Safe — Who you are

Fill in the fields above to generate the script.
ATC Authorisation Record
Hazard Assessment

P = Probability (1–5)  |  S = Severity (1–5)  |  Risk = P x S  |  New Risk = residual risk after mitigation

Hazard description P S Risk Mitigation New risk
Risk Assessment

Risk Probability (1–5) x Risk Severity (A–E) = Risk level

High — Do not take off!
Medium — Be cautious!
Low — Safe to take off.
Operational Considerations
IMSAFE — Fitness Assessment

Pilot self-assessment — answer honestly before every flight

Emergency Response Plan

Before flight operations commence the Safety Officer/Pilot shall ensure that the following information is available where applicable. Complete with the closest emergency services to the area of operation.

ServiceLocationContact detailsAdditional info
Fly-Away Zone
Sketch area — attach a fly-away zone map or describe the boundary in the field above.
Tip: Paste a Google Earth screenshot link or coordinates above.
Operational Area
Sketch area — attach an operational area map or describe the area above.
Tip: Paste a Google Earth screenshot link or coordinates above.
SACAA Flight Plan — CA 172-04 (RPAS)

Required for controlled airspace or BVLOS operations needing ATC filing. Leave blank if not applicable.

7 Aircraft identification
8 Flight rules / type of flight
9 No. / type of aircraft / wake turbulence
10 Equipment (COM/NAV/SSR)
13 Departure aerodrome
13 Off-blocks time (UTC)
15 Cruising speed
15 Cruise level
15 Route
16 Destination aerodrome
16 Total EET
16 Alternate aerodrome
19 Endurance
19 Persons on board
18 Other information (STS/, RMK/)
19 Emergency equipment / survival equipment / pilot
Export & Save

Generate your complete briefing document, then print to PDF or export data.

Click "Generate briefing document" to preview your complete AIS Pre-Flight Preparations document here.
🔒 Export to AIS Flight Ops

Generate a pre-flight authorisation token for import into AIS Flight Ops. The token confirms this pre-flight was completed and authorised. AIS Flight Ops will not permit mission execution without a valid token.

AIS Pre-Flight Preparations — Aerial Inspection Solutions (Pty) Ltd — SACAA Part 101 RPAS — Revision 3